91青娱乐极品盛宴在线视频_国产亚洲视频在线观看视频在线_日韩野战在线视频观看视频_免费毛片在线播放无需下载_亚洲国产中出白丝_91嫩草欧美久久久九九九_亚洲综合av无码一区二区_午夜福利第81国产_亚洲图片片在线观看_国产手机在线精品

新聞banner
Current location : HOME >> News >> Industry Information

In order to ensure the normal operation of the booster cylinder, what should be paid attention to in use?

2022-01-06

Because the pressurized cylinder is often in high-speed operation state, which is easy to cause machine wear, it should be operated according to the operation manual. The working temperature of the pressurized cylinder is about -5℃~60℃, and the operating speed is 50~1000mm/s. In order to ensure the normal operation of the pressurized cylinder, the following points should be paid attention to in use:


1. Keep clean

Before connecting the gas-liquid booster cylinder to the gas path, please remove dust and other debris in the pipeline and components first, so as not to reduce the service life of the booster cylinder.


2. Use within the normal pressure range

Cylinder in normal use of the working pressure must be in accordance with the inspection report stipulated in the working pressure range, shall not exceed the specified working pressure.


3. Pay attention to the working environment of the booster cylinder

The temperature in the working environment has been fixed when the cylinder is designed. If the working environment exceeds the temperature due to work needs, contact the relevant technical personnel of the pressurizing cylinder.


As part of the components in the cylinder are made of iron, please do not use it in the complex environment (such as the contact environment with chemical substances). In addition, please install effective air treatment components (three-point combination) at the front of the cylinder and lubricate and drain when connected.




4. Do not add other hydraulic oil without permission

The hydraulic oil price used in the design of the pressurized cylinder is VG68# anti-wear hydraulic oil, which can not be removed without using other liquid media (such as oil). Water, etc.).


5. Always follow the procedure

The action program must work according to the action program of the gas path installation drawing, namely, prepressure action - pressurization action -pressurization release - prepressure reset


6. Pay attention to maintenance and check the operation of the pressurized cylinder regularly

In order to avoid excessive pressure damage to your mold or workpiece when the cylinder is pressurized, please install a pressure reducing valve at the inlet of the pressurized section, so as to effectively protect your product.


In order to ensure the stability of the supercharging cylinder, it is suggested to install an air storage cylinder in parallel between the triplet and the supercharging cylinder as far as possible.


When the booster cylinder is used for more than 500,000 times or more than half a year, it is recommended to replace all the hydraulic oil in the cylinder once, in order to improve the service life and working life of the cylinder.


標簽

Recently Viewed: